Project 2: Construction of Roadway at Power Plant This project was discussed in detail in the June 14, 1999 issue of Rocky Mountain Construction Magazine (Vol. 80, No. 11). Removal of original road separating two ponds. Pugmill mixes fly ash (12%) and road base (77%) with water (10%). Dump trucks deliver road base material. Mix is compacted in six inch lifts. Completed road is 28 feet high, 525 feet long with expected service life of 15 years.
Project 2: Construction of Roadway at Power Plant
This project was discussed in detail in the June 14, 1999 issue of Rocky Mountain Construction Magazine (Vol. 80, No. 11).
Removal of original road separating two ponds.
Pugmill mixes fly ash (12%) and road base (77%) with water (10%).
Dump trucks deliver road base material.
Mix is compacted in six inch lifts.
Completed road is 28 feet high, 525 feet long with expected service life of 15 years.