The water
is mixed in such a way as to result in an approximately
9 inch layer after compaction. A sheep's-foot
roller compacts the mix and then a layer of aggregate
is paced prior to paving. This lime/ash mix was
selected to achieve certain geo-technical properties
at the project, to ensure uniformity.